Reports

Written reports

• Denham, Sam, Allen, Christopher and Chu, Reynold, ISS Sound Level Survey Report. 3 February 2008. • Tang, Punan, Goodman, Jerry and Grosveld, Ferdinand, Vibro-Acoustic Characterization of the Life Sciences Glovebox Work Volume Qualification Module. Test Location: Bradford Engineering, BV, Heerle, Netherlands, tests performed 3-7 February 2004, Report 30 March 2004. • Goodman, Jerry and Grosveld, Ferdinand, Functional Cargo Block (FGB) Acoustic Considerations. NASA Johnson Space Center, 8 May 2001. • Goodman, Jerry R., Specifications and Orbiter Elements. Report to NASA Headquarters Acoustics Working Group, April 1992. • Goodman, Jerry R., Acoustics Working Group Specifications and Orbiter Elements Subgroup Status, Report to NASA Headquarters Acoustics Working Group, 4 December 1991. •

Other

• Goodman, Jerry, CAM/CR/Payload Acoustics. Reference to December 2002 Acoustic TIM with NASDA, 22 July 2003. • Goodman, Jerry, LSG Acoustics. 22 July 2003. • Goodman, Jerry, Acoustic Issues. May 28, 2003. • Goodman, Jerry, Summary of 11A SORR acoustics and service Module status. 3 October 2002. • Goodman, Jerry, On-board Acoustics quieting kit. 3 September 2001. • Goodman, Jerry, R. ISS Acoustics and Plan of Action, 9 September 2000. • Fischer, Craig, NASA ISS Acoustics Plan, partial slide summary sent to J. Goodman, 25 August 2000. • Goodman, Jerry, Flight 1R CoFR-Acoustics. Requirements, activities, open issues/risks, and plans, 31 May 2000. • Goodman, Jerry, 2R Stage Operations Readiness Review (SORR)-Acoustics. 3 October 2000. • Goodman, Jerry, Service Module Acoustics. August 1998. • Goodman, Jerry, JSC Acoustical Noise Assessment. NASA Johnson Space Center, Houston, Texas, 11-12 April 1996. • Goodman, J.R. Acoustic noise reduction/attenuation foam/materials, August 1996, which included acoustic materials information obtained in 1990’s believed to be from Pedley, Michael D., and/or Chang, Chia. • Goodman, J.R., ISSA Acoustical Noise. 2 November 1995. • Goodman, J.R., New Acoustical Noise Control Requirements for the Space Shuttle Program. Briefing to the Space Shuttle Program Control Board, November 1993. • Goodman, J.R., Acoustical Noise Exceedance for SLS-1 payloads Animal Enclosure Module (AEM), and Orbiter Refrigerator/freezer (ORF), 19 April 1991. • Goodman, J.R., STS-40 Acoustical Noise Results and Summary. Signed by Daniel Germany. Memorandum from Manager, Orbiter and GFE Projects to distribution, 30 July 1991. • Goodman, J.R., Acoustical noise concerns with SLS-1 Mission payloads. Signed by Daniel Germany. Memorandum from Manager of the Orbiter and GFE Projects, 24 August 1990. • Figure, One-third octave band plot of Apollo CM noise. Informally provided by Rockwell International Corporation to Jerry Goodman during early Shuttle development. • Figure, Measured cabin noise levels in 2 TV-1 CM with one-third octave band plots of 5 psia, 14.7 psia, and noise floor. Obtained by Jerry Goodman from acoustics personnel who worked Apollo during early Shuttle development.
© Lorem ipsum dolor sit Nulla in mollit pariatur in, est ut dolor eu eiusmod lorem
ACTIVATEFITNESS

Reports

Written reports

• Denham, Sam, Allen, Christopher and Chu, Reynold, ISS Sound Level Survey Report. 3 February 2008. • Tang, Punan, Goodman, Jerry and Grosveld, Ferdinand, Vibro-Acoustic Characterization of the Life Sciences Glovebox Work Volume Qualification Module. Test Location: Bradford Engineering, BV, Heerle, Netherlands, tests performed 3-7 February 2004, Report 30 March 2004. • Goodman, Jerry and Grosveld, Ferdinand, Functional Cargo Block (FGB) Acoustic Considerations. NASA Johnson Space Center, 8 May 2001. • Goodman, Jerry R., Specifications and Orbiter Elements. Report to NASA Headquarters Acoustics Working Group, April 1992. • Goodman, Jerry R., Acoustics Working Group Specifications and Orbiter Elements Subgroup Status, Report to NASA Headquarters Acoustics Working Group, 4 December 1991. •

Other

• Goodman, Jerry, CAM/CR/Payload Acoustics. Reference to December 2002 Acoustic TIM with NASDA, 22 July 2003. • Goodman, Jerry, LSG Acoustics. 22 July 2003. • Goodman, Jerry, Acoustic Issues. May 28, 2003. • Goodman, Jerry, Summary of 11A SORR acoustics and service Module status. 3 October 2002. • Goodman, Jerry, On-board Acoustics quieting kit. 3 September 2001. • Goodman, Jerry, R. ISS Acoustics and Plan of Action, 9 September 2000. • Fischer, Craig, NASA ISS Acoustics Plan, partial slide summary sent to J. Goodman, 25 August 2000. • Goodman, Jerry, Flight 1R CoFR-Acoustics. Requirements, activities, open issues/risks, and plans, 31 May 2000. • Goodman, Jerry, 2R Stage Operations Readiness Review (SORR)-Acoustics. 3 October 2000. • Goodman, Jerry, Service Module Acoustics. August 1998. • Goodman, Jerry, JSC Acoustical Noise Assessment. NASA Johnson Space Center, Houston, Texas, 11-12 April 1996. • Goodman, J.R. Acoustic noise reduction/attenuation foam/materials, August 1996, which included acoustic materials information obtained in 1990’s believed to be from Pedley, Michael D., and/or Chang, Chia. • Goodman, J.R., ISSA Acoustical Noise. 2 November 1995. • Goodman, J.R., New Acoustical Noise Control Requirements for the Space Shuttle Program. Briefing to the Space Shuttle Program Control Board, November 1993. • Goodman, J.R., Acoustical Noise Exceedance for SLS-1 payloads Animal Enclosure Module (AEM), and Orbiter Refrigerator/freezer (ORF), 19 April 1991. • Goodman, J.R., STS-40 Acoustical Noise Results and Summary. Signed by Daniel Germany. Memorandum from Manager, Orbiter and GFE Projects to distribution, 30 July 1991. • Goodman, J.R., Acoustical noise concerns with SLS-1 Mission payloads. Signed by Daniel Germany. Memorandum from Manager of the Orbiter and GFE Projects, 24 August 1990. • Figure, One-third octave band plot of Apollo CM noise. Informally provided by Rockwell International Corporation to Jerry Goodman during early Shuttle development. • Figure, Measured cabin noise levels in 2 TV-1 CM with one-third octave band plots of 5 psia, 14.7 psia, and noise floor. Obtained by Jerry Goodman from acoustics personnel who worked Apollo during early Shuttle development.